This project consisted of:
The replacement of 22 fan coils within a sensitive area of the airport. All works were carried out during the night and within a 4 hour working window.

This project consisted of replacement of all siphons and flush buttons in all toilets amounting to 2,600 replacements as part of a water saving scheme.
.jpeg/:/cr=t:0%25,l:22.92%25,w:54.17%25,h:100%25/rs=w:365,h:365,cg:true)
This site consisted of multiple projects:
- Children's Mental Heath Ward
- Intensive Care Unit (ICU)
- Infusion suite
- CT Scan Room
- Emergency call outs
.jpeg/:/cr=t:0%25,l:16.11%25,w:67.78%25,h:100%25/rs=w:365,h:365,cg:true)
This project consisted of toilet refurbishments, which included:
- All above ground drainage
- All domestic water feeds
- All sanitary items
.jpeg/:/cr=t:0%25,l:13.37%25,w:73.26%25,h:100%25/rs=w:365,h:365,cg:true)
The project consisted of:
- Full refurbishment of the toilet block.
- All existing services stripped out and isolated.
- Full insolation of all WC's.

This project consisted of:
- New toilets
- New food tech facilities

This project consisted of:
- All site temps
- All instillation mains cold water services.
.jpeg/:/cr=t:0%25,l:19.09%25,w:61.82%25,h:100%25/rs=w:365,h:365,cg:true)
This project consisted of of three phases:
Phase 1 - Boat service workshop
Phase 2 - Fit out of main changing rooms and shower core.
Phase 3 - New Café building